No. A PCRA (preconstruction risk assessment) evaluates potential risks before construction begins and determines if an ILSM (interim life safety measure) is needed. If risks are identified, then an ILSM assessment is completed as part of the PCRA process.
Is a Pre-Construction Risk Assessment (PCRA) the same as an ILSM?
Subscribe
Log in
0 Comments